Leave a Message
Thank you for your message. I will be in touch with you shortly.
Explore Featured Properties
Ivory stucco home with a metal roof, shaded raised porch, paver approach and a curved palm beside the lawn.

The Green Spine's Final Piece Is Its Starting Line on West Cass Street

October 29, 2026

At Howard Avenue and Cass Street, near the Armory in North Hyde Park, a two-way bike lane runs east behind three-foot raised concrete dividers. Until September, that block was a work zone. The City of Tampa said on Oct. 23 that the Green Spine Cycle Track is complete. The project took more than a decade, and the last segment built sits at the west end of the route, which is where every eastbound ride now begins.

That order matters for anyone living in North Hyde Park, West Tampa or the western edge of downtown. The newest part of the track runs through your part of town. Cass Street between Howard and Rome is also the stretch where businesses and developers are already planning around people who arrive on two wheels.

What Finished in September

The full Green Spine runs 3.5 miles east to west. As WUSF reported, it starts at Howard and Cass near the Armory, follows Cass Street through downtown to Nebraska Avenue, picks up Nuccio Parkway into Ybor City, and takes 15th Street to Cuscaden Park at 21st Avenue.

The City calls the final segment Phase 2A. It covers a little more than a third of a mile of W. Cass Street between N. Howard and N. Rome avenues. Construction started last October and wrapped up this September. The whole project cost roughly $8 million, and grants covered nearly 80% of it. The City paid the remaining $1.6 million.

The City's Eco-Counter at N. Boulevard and Cass Street counted nearly 80,000 cyclists on the Green Spine in 2025. So far in 2026 it has logged nearly 60,000. The 2026 number covers most of a year when the west end was a construction site. Next year will be the first full year with the whole western stretch open.

Two Stops Between Howard and Rome

The City picked a West Cass Street business owner to talk about what the track has meant. Justin Basil owns Urban Jungalow, a cafe at 1910 W. Cass St., and he told the City and WUSF why the cafe added a bike rack:

"We're a health-focused company. We intentionally installed a bike rack here because of the increase in traffic we get from, whether its cyclists, scooters, or pedestrians."

Urban Jungalow's hours fit two kinds of rides. Monday through Wednesday it is open 8 a.m. to 3 p.m., which works for a morning coffee stop. Thursday through Sunday it stays open until 9 p.m., late enough for an evening ride that ends with dinner.

Farther east on the same stretch, Cousin Vinny's Sandwich Co. serves New York-style Italian sandwiches at 1331 W. Cass St. The Tampa Bay Times covered its opening in January 2025, in the space that used to be Cass Street Deli. It opened about nine months before construction on the final segment began, so it was already in place when the protected lane arrived.

Mayor Jane Castor said in the City's announcement that "new businesses have opened up along Cass Street." What Rocwell is planning shows how much more could come. Rocwell has spent several years buying and redeveloping property at the corner of Cass Street and Rome Avenue, and Tampa Bay Business & Wealth reported in June that permits had been filed for a three-building wellness campus there. It would anchor a group of properties called Cass United. The concept plans include:

  • A bathhouse with saunas, cold plunges, float therapy and hot tubs
  • Space for yoga, Pilates, personal training and breathwork
  • Recovery services such as massage, acupuncture, IV therapy, stretching and compression therapy
  • A coworking space, a market and a cafe

For now, the campus is a filed proposal, not a building you can visit. But the corner it would take up, Cass and Rome, is the same corner where the new protected lane ends.

Across the River to the Parks

Head east from Rome and Cass Street takes you over the Hillsborough River on the Cass Street Bridge, which the City has long treated as part of the downtown section of the track. Two Riverwalk parks sit on opposite banks of the river near that crossing.

Julian B. Lane Riverfront Park is on the west bank, across the river from the Straz Center. It has a dog park, a kayak launch, a water-taxi stop, a playground and splash pad, sports courts and fields, a performance lawn, and rowing and dragon-boat facilities at the River Center.

Curtis Hixon Waterfront Park, at 600 N. Ashley Drive, has its own splash pads, a playground, a dog run, a festival lawn, a water-taxi stop and direct access to the Riverwalk. You can ride from Howard Avenue, cross Cass Street, and finish at a Riverwalk park on either bank.

The City also says the Green Spine connects to the West Riverwalk Extension in two places. The next big change on the west side will happen there.

The Piece That Reaches Cass Next

A short stretch of the Green Spine is still unfinished. The City says a small segment near N. 15th Street, at the Ybor end, will be completed by an FDOT contractor, likely in the spring once its interstate work is done.

The bigger addition for the west end is the West Riverwalk along the University of Tampa campus. In an August 12 update, the City described a new 12-foot-wide multi-use trail running nearly 2,000 feet from Plant Park to Cass Street. The Haskell Company was building it, and it was expected to open by the end of the year, weather permitting.

The design borrows from the campus around it. Brick bands along both sides match UT's historic buildings and the brick already in Plant Park. A small piece of the original path, with stamped concrete dating to the early 1900s, was kept and built into the new trail. The plan also calls for about 65 new palm trees and at least five hammock stations.

The UT section is one part of the larger West River BUILD project, which the City expects to finish in spring 2027:

West River BUILD, per the City's August 2026 update Detail
New West Riverwalk About two miles
Roadway improvements About three miles
Segments under construction in August Five of six
Total project cost Nearly $60 million
Federal BUILD grant $24 million
West Tampa CRA contribution $10 million
Expected completion Spring 2027

The UT trail ends at Cass Street, where the Green Spine already runs. When it opens, someone starting at the Armory will be able to ride east on the protected lane and then turn south along the river past the university to Plant Park, all without leaving a bike path. Updates and renderings are on the West River BUILD project site, and current lane closures are posted on the City's road closures page.

Reasons to Ride It Through the Holidays

The fall and holiday calendar gives you a few reasons to try the route right away:

  1. Oct. 30, 4 to 11 p.m. Oktoberfest Tampa is on the City's calendar along the Hillsborough River.
  2. Nov. 20 through Jan. 3, 2027. Winter Village returns to Curtis Hixon Waterfront Park with skating, food and drink, shops run by local makers, and entertainment on Saturdays.
  3. Nov. 28 and 29, 1 to 4 p.m. Winter Village holds its Shop Small Weekend. The vendor lineup had not been posted yet.

If you live along this corridor and you're wondering how the new lane, the Riverwalk tie-in and the projects at Cass and Rome might affect your block over the next couple of years, I'm happy to talk it through. KT Tershowski follows West Tampa and North Hyde Park closely, and I'm glad to share what I'm seeing as these projects open. Let's Connect.

Follow Us On Instagram